Wood flooring
Tile flooring
Kitchen rearranging
New propane stove
New butcher block island top
New wall
The wood floor has been started but is at a stand still while we wait for the wall to be completed. David, our contractor, has been finishing the wall I built so it will look nice, not like a wall I built.
But David has a full time job and he fits us in as he can and we appreciate that a lot. Today he will spray texture onto the wall and tomorrow we can continue with the flooring.
The tiles are beautiful but we haven't gotten the subfloor finished yet, so no tiles have been installed. No hurries.

For around the stove I'd like new butcher block counter tops on either side of it and the island is for sure getting butcher block. The wall behind the stove, which was previously behind the tall double ovens, needs some work. I had painted a red color on the walls just to the edge of the ovens, now I need to fill in some holes and paint again.
I've moved the microwave that used to sit on a shelf on that wall. We've has the coffee pot under here.
All of these photos are of the old house, before we did all the work.
After we get the floor done we'll install the butcher block, then a fan above the stove. I want it to have an awesome top so that when you look into the kitchen its dramatic, not drab.
This is the wall we took out, about 6 feet total. Its got about 2 feet we can't see from here, so we removed an L shape and the new wall starts about at the left of this mirror. The heater is gone, as is the parquet and carpet.Everything is a jumble right now!