Saturday, March 28, 2020

Almost Finished Master Bath

The master bathroom is going well, we've got the new double vanity installed & the under sink leak fixed. I had anticipated this & put down a puppy piddle pad, glad I did. 

The vanity top came with a 4 inch tall back splash but since it fits PERFECTLY into the area, we'll need something on the side walls also. So we picked out a matching tile to go up about 12 inches on the sides & above the backsplash. 

We're putting shiplap on the back wall, I've already painted the wall & the boards, cut them to size and they are ready to go onto the walls. 

A mirror has been purchased, its just wide enough to fill the area & we'll put a frame made from the flooring around it to match.

There is very little painting left to do in the master bath, just a bit on the ceiling & around the tub. Then we'll put new caulking around it.
 The flooring looks very nice, its a gray & the vanity is brown. I like both together, they aren't too much of one color. The flooring is also waterproof so we won't be worrying about wet floors.

It is no longer a Jack & Jill bathroom, today the doorway was covered over.




And what the other side looks like currently. 


And what it looks like looking from the door on the right toward the left, where the shower is

Our FINISH goal date has been April 6th for the last two months but with Covid19 happening, we're not even sure we can list the house for sale. We definitely won't be able to show the house but we're going to continue to work and keep as tight to the schedule as we can so we can take some time off before it IS listed.

Once the building is done I'll need another two weeks to clean all the dust off everything.





No comments:

Post a Comment